ADU Permit

Accessory Dwelling Unit Permit Guide

ADUs usually require zoning review, building permits, utility planning, fire and life-safety review, and inspections from foundation through final approval.

Reviewed July 26, 2026

Permit likelihood

Almost always required for detached ADUs, garage apartments, basement apartments, and new independent dwelling units.

Broad planning range

$1,000-$10,000+ in permit, impact, utility, and review costs depending on location and scope.

Planning timeline

Two to six months is common where plan review, utility review, and zoning checks are required.

Cost and timing ranges are general planning examples, not local quotes. Verify the current fee schedule, review queue, and inspection availability with the offices serving the property.

Common permit triggers

Documents to gather before applying

Inspection sequence to plan around

Mistakes that create delays

State and city variation

State ADU laws may limit local restrictions, but city zoning, utility, and building-code review still control the permit.

Contractor questions

Build a project checklist